The Swann Structural & Architectural Steelwork team have completed a design, fabrication and installation project of balcony stacks for four blocks of flats in Colchester, Essex.
The project consisted of nine double storey and three single storey stack balconies that were galvanised and powder coated with clamped glass infill panels.
The full range of posts, frames and balustrade were fabricated at our factory in Braintree. The frames, galvanised flooring and glass were fitted on site with use of site plant and cherry pickers.
The team also fabricated and installed the internal balustrade, wall handrail and parapet capping on the roof.
For more information on this project or to discuss your requirements, please contact Paul Harris on 07885223474 or via email
Fill in your details below and the brochure will be sent to your inbox